PFC Maintenance- August 2024
- PQIS Ltd.
- Aug 6, 2024
- 1 min read
The maintenance of power factor correction equipment at a food processing site was carried out by PQIS engineers during August.

The LV Supply is achieving a 1.00 power factor value with the PFC Unit in circuit.
Improving the power factor of an electrical system will reduce the reactive power and electricity costs.
The maintenance challenges faced by the Pakistan Furniture Council (PFC), highlighting the need for timely and efficient upkeep to ensure operational excellence. In academic settings, meticulous attention to detail is equally crucial. Students aiming for high-quality assignments can greatly benefit from the expertise of a university assignment writer, who can assist in crafting well-researched and thoughtfully presented work. Such professional support not only enhances the quality of submissions but also aids in meeting academic standards effectively.