top of page
Search

Power Factor Correction Unit Maintenance 2024

PFC Maintenance carried out on a 300KVAR unit installed by PQIS for industrial business in Manchester, April 2024.


Power Factor corrected from 0.78 to 1.00 reducing maximum demand and cost.





8 views1 comment

Recent Posts

See All
bottom of page
Engineering Directory - Directory listing UK engineering companies. UK Directory Listings of Electrical Services Companies - Provided by the Business Directory UK